7. Plumbing Works Fit-Out [Clean Water Line, Sanitary Line, Water Closet/Lavatory Faucet/Soap Tissue Holder, Shower Head/Valve, Sink, Sink Faucet, Hosebibb, Multi-point Water Heater, Bath Tub, HP Pressure Pump and Pressure Tank].....................….............…......….511,000.00
8. Electrical Works Fit-Out [Conduits, Utility Box, Junction Box, Panel Board, Outlet, Switches, Pin light, Center Light and Wall Lamp]...........................…....502,557.10
9. Metal Works [Window Grills, Stair Railings and Balcony Railings]...........................................247,483.03
10. Thermal and Moisture Protection [Dam proofing]..................…....24,321.80
12. Waterproofing...............…................…..…67,493.00
13. Painting and Varnishing [Masonry Surface, Flat Paint Finish, Wooden Surface and Metal Surface].....................…................…....474,783.13
14. Floor Finishes [Tiles, Adhesive Cement, Tile Grout, Kitchen Counter Top].........370,869.51
15. Wall Finishes [Wall Tiles, Adhesive Cement, Tile Grout, Decorative stones].........93,316.88
16. Doors......................................…...133,750.00
17. Door Fixture [Hinges, Door Knob, Door Lock Set, Dead Lock, Stopper]…..........44,787.50
18. Carpentry [Baseboards, Cornice, Stair Thread, Stair Hand Rail, Stair Post, Bedroom Closets and Kitchen Cabinets]..................….................…..262,442.39
19. Windows......................................133,000.00
RESIDENTIAL COST...............….5,973,864.56
1. Siteworks and Earthworks .........….......................…264,843.75
2. Concrete Works]...............…..................….281,728.22
3. Reinforcement ..................…................…...198,919.62
4. Formworks.....................…..….........…..118,148.00
5. Electrical Works Fit-Out..............................86,250.00
6. Metal Works..................…...................…..164,072.36
7. Painting and Varnishing ..................…..............146,373.75
8. Rooftop ....................................…...178,487.84
9. Pool...…......................................…238,652.47
C. APPLIANCES, ITEMS OF FURNITURES, FIXTURES AND AIRCON UNITS......2,587,413.15
D. ILY TAE'S COFFEE AND REI'S SNACK-HAUS COST AND OVERALL.......…....1,792,159.37
GRAND TOTAL.........................…12,030,913.09
LESS DOWNPAYMENT.......................…..….10,000,000.00
LESS 10% DISCOUNT........................1,203,091.31
BALANCE PAYABLE............................827,821.78]
Lilliana reacts right after seeing the final billing statement for Miss Rei. ”Wow, I never expect that Miss Rei's down payment is 10M Sean ... tsk, tsk, Millions for Miss Rei is just like a cent to her, huh so how much for Madame...…..[suddenly pause since she almost blurted it out]”
”Huh?” Luckily Lewis didn't catch up since he is busy at the moment.
”Nothing and don't mind that one, and so then, Lewis how much income you have after the materials and cost, huh?”
”I guess, 40%”
”Eh, and what.....? --- 40 ------ 40%, are you sure?” Lewis nodded while Lilliana automatically searching her phone and just realizing that she's only got wrapped by a towel so she asks Lewis right away. ”And so what's 40% of that?”
”I guess 4M up [only estimating since he also only wearing a boxer and then remind his woman] alright Lilliana let's take a bath now since it's almost working hours now and you also need to report to Mrs. Jun, right?”
Lilliana suddenly recalls that Lewis almost lost a million because of that incident and suddenly shivers.
”Hey, are you alright?”
”Uh-uh and it's just that I realized if it's not for me then you really lose a million, huh”
”Huh, and what do you mean?” [Liliana explains right away and he gets it] oh, right thanks for that and well, let's take a bath now, okay?”
”Yup, yup” and the two go together to the bathroom.