Chapter 221 (1/2)

The second day.

Monday.

After breakfast, Tang Qing asked Sun Chao to pick him up and go to Tianyan's headquarters under construction. The second uncle's big run stopped under the building of uncle's community. During the class, he dared not drive out waves. Fortunately, he had some money in his life. Otherwise, he would worry all day about whether there would be a bear boy rowing the car.

Tang Qing suddenly found that this was a real problem. There were not many cars in the community, but many of them were ”scarred”. However, some of those old cars were scratched. His second uncle was a brand-new Mercedes Benz. If he was scratched, he would not be upset, but his mother and uncle would be upset for a while.

It seems that I can find a way to communicate with my uncle and park in another place.

Ten minutes later.

Tang Qing came to Tianyan's new headquarters.

At this time, Tianyan new headquarters is a huge and busy construction site. With the sound of workers beating and cars roaring, there are various kinds of trucks constantly transporting earthwork back and forth. From the perspective of location, Tang Qing knows that this is the earthwork of the artificial lake. Because during the rush time, the construction and excavation of the reservoir army is carried out in three shifts in 24 hours, which is so fast The speed at which the lowest basement is capped.

Fortunately, the floor is not too high, or it will take a long time just to wait for the foundation to settle. After all, high-rise buildings are not like the small second floor in the village. If you dig a pit, you can build a house on a strip foundation.

Knowing that Tang Qing is coming, he Zixin, deputy general manager of Tianyan who is in charge of the project here, and the boss of the construction company, Chu Jun, arrived at the construction site early. Today is not only a day for Tang Qing to come, but also a day for staged acceptance. However, there is nothing about Tang Qing and he Zixin. It's OK to have a representative of Party A of the construction industry present. We can only say that they just caught up.

Tang Qing saw a group of people standing at the gate of the construction site from afar. He Zixin was in front of him, and Chu Jun was chatting with him from time to time. He Zixin's smile was supposed to be praise. In addition, some other people were waiting there. Apart from a chief engineer of the Design Institute, Tang Qing didn't know any of them.

Seeing Tang Qing's car coming, a group of people immediately stopped chatting, and he Zixin straightened his clothes and stood straight with a folder in his arms.

When Tang Qing got off the car, he Zixin hurriedly came forward to greet him with a smile: ”general Tang is good.”

”Manager he, I'll have a look. It's not a big deal. You come here specially. Don't do that next time.” Tang Qing said with a smile.

Although he said this, he also knew that the other side would not listen to it at all. This is the case with the domestic workplace culture. It should be said that the workplace culture of the whole world is basically the same. Subordinates are all based on the principle of how close to the boss. You can't say what you can't do with a straight face. You can't help being concerned by the ”people”.

It's a fucking workplace culture.

”Yes, and I also want to see the progress of the project. It hasn't come in more than a week. It's a big change.” He Zixin said with a chuckle.

”Yes, I hope it will be as beautiful as the design.” Tang Qing nodded, then turned his head and joked to Chu Jun, who stood aside respectfully, ”boss Chu, I see you are a little thin recently.”

”Mr. Tang has a good eye. I've been busy with the project for a long time. I've lost more than two Jin.” Chu Jun laughs. In order to catch up with the construction period, he has worked hard. He is very motivated to get such a good job. As for the project that trapped him in the mire over there, it has gradually improved. After so many days of work stoppage, the boss is in a bit of a hurry. The key is to buy a house. If you don't start, you will be asked to pay back. So he is busy on both sides now.

”That's good, so please take me around.” Tang Qing said that he did not go to the reservoir first, but was prepared to see the progress of the construction first. These are all planned and designed according to his wishes, which is also a small half of his works. It's also fun to watch these works take shape slowly. Otherwise, he doesn't need to come at all.

”OK, Mr. Tang, brother sun. This is the helmet.” Chu Jun hands Tang Qing a white helmet.

Other people also took a helmet on the table at the door. Although the formwork of the main building was just out of the horizon, Tang Qing was not interested in violating the regulations that the helmet must be worn in the construction area.

Then Chu Jun took Tang Qing and his party around the whole headquarters.

”Mr. Tang, now the basement on the ground floor has been capped. We will guarantee the speed of building on the top floor in six days. In another month, you can see your complete office building. The canteen and dormitory have also begun to come out of the ground. It is estimated that even the decoration can be almost done in a month. Now we have the earthwork of artificial lake, which does not need to be covered Construction, we are the last to dig... ”

All the way, Chu Jun explained carefully. In order to make a good impression on Tang Qing, the super second generation, he also called his own company's model project by the way, so Chu Jun knew the whole design plan very well and watched the progress and quality every day.

Basically, after the whole turn, Tang Qing was very satisfied and turned around and said, ”yes, Mr. Chu, take me to the basement.”

”OK.” Chu Jun quickly agreed to lead the way ahead.

At this time, the workers are erecting the formwork of the first basement, and many places are binding the reinforcement of the floor slab, which is carried out in sections.

Come to the second floor of the basement.

At this time, the formwork has not been removed, the steel pipe is horizontal, and there are many wooden and concrete blocks on the ground. It is inconvenient to walk, but it does not affect the use of the ”water storage pool”.