1645 Chapter 1644 Full of surprises (please subscribe!) (1/2)
first day.
Piling.
Below is iron ore.
Very hard.
Relying on two pile drivers, tens of thousands of steel piles were driven down in one day. While driving down, the horizontal load-bearing beams were buckled at the same time so that they could bear the weight of the upper building.
Make ground beams during the day.
Adjust the beams and slanting supports at night.
...
the next day.
Planking.
Spread standard hard plates on the surface of the upper alloy beams and fix them with bolts. Because of the inclined flat support, there is no hollow feeling when people step on it, and there is no shaking at all.
There is no problem driving up.
then.
30,000 square meters were paved during the day, and the building columns were constructed at the same time.
Same as building blocks.
Just splice.
Bolt fixed.
There is not even one soldered place.
at night.
The main frame of all the buildings was erected.
...
The third day.
Standing wall.
same.
Put the plates in the designated place and tighten the bolts. The plates themselves are fireproof materials, with rubber on the four sides, and the color is left out of the factory. Therefore, once installed, it is the final product.
No need to seal.
No need to brush.
that's it.
Early in the morning on the fourth day.
One wakes up.
They were notified to move.
that moment.
They have fully realized the power of modularity. When the cost of cooperation between different components is minimized, it is like an organization's information communication without hindrance and acting in accordance with the same standard.
The efficiency increase brought is terrifying.
...
”What? Three days?”
”impossible.”
”Speaking of workstations, I seem to be a little bit impressed. Our country bought their oasis before. There are such workstations in various renovation stations, with similar styles. I heard that the construction is very fast.”
”However, the scale is different.”
”Yes indeed.”
”...”
This efficiency.
It really scared them.
At this time.
”They don't stop during the day and night. Strictly speaking, it took six days.”
This explains.
Obviously a bit'far-fetched'.
Three days are three days, and one day at night is what counts. In engineering construction, statistics are always calculated on a 24-hour day cycle. Even if you work overtime, it is also one day.
”These flowers...”
Outside the window.
The grass is lush.
Flowerbed brocade.
The green trees on the roadside are swaying, and the greening is done quite well, not at all like in the desert.
”The container was transported, and they planted the last night. They used special machinery, which was as fast as an automatic rice transplanter. I woke up and saw that they were all planted.”
”...”
It seems to be true.
Three days.
This large resident site has been repaired.
Greenery has also declined.
”How much do you get?”
”I don't know, it's definitely not cheap.”
”I guess at least 100 million.”
”More than that.”
”It depends on buying or renting. The former is more expensive and the latter should be cheaper. However, even with such a large scale, even if it is rented, it will cost at least 100,000 a day.” There are no less than 30 buildings outside the window.
The lowest are two floors.
Most are three floors.
”Not tens of millions a year.”
”...”
”It's rented. I don't know how much the price is, but it's definitely not cheap. The real resident of the living area is still under construction, and the progress is not fast. It is expected that it can be moved in by the end of the year and it will be demolished by then.”
”Pity.”