Chapter 187 - Shocking Construction Plan (1/2)

Transdi Three Rows Of Books 29910K 2022-09-11

Chapter 187: Shocking Construction Plan

Chapter 187 – Shocking Construction Plan

[Is this AI bugged?]

[A top speed of 14,000km/h…]

[Awesome! Awesome! Awesome!]

[How scary…]

[Newton: China isn’t under et? Railway Construction: Beyond the speed of light!]

[There’s no way this speed is achievable, right?]

[Isn’t the theoretical top speed of ic doesn’t work in Transdimensional Review’s channel]

[Rather than the train’s speed, shouldn’t we pay more attention to its construction capabilities?]

Amidst the hustle and bustle in the bullet comment section, the train’s AI coun the second phase

“When in construction th will shrink to 294 meters The construction process is split into four steps, of which the first till be conducted simultaneously

“One: The threaded carbon alloy drill bit will be activated, and it will be used to drill an 18-round The recommended depth is 750 to 1,200 meters below sea level

“Two: The soil and rock collected by the drill bit will be coh pressure The compressed debris will then be expanded by the front bezel to for the tunnel

“Three: After the temporary vacuum pipeline is constructed, insert the necessary aanese, zinc, and twelve other metals and rare-earth metals into the material reserve cothen and lay tracks on the teh pressure air pumps that are connected with the surface will be constructed at intervals of 200 kilometers…”

The explanation of the train AI was monotonous and complicated However, with the help of pictures and videos, Chen Yu and the livestrea of the vacuum pipeline’s construction process

Overall, the process wasn’t very complicated The only part that Chen Yu took note of was the third step—inserting the “necessary aold, and othertheseendeavor for Chen Yu However, if he didn’t have these lev train’s vacuu, Chen Yu touched the crystal ball and paused the AI’s introduction He then looked toward the cauys are watching the stream, so you should’ve heard what the AI just said I require large amounts of metals to construct the vacuuress s so, Chen Yu walked to the right side of the hall and sat on a leather sofa Crossing his legs, he continued, “I think this transaction is beneficial to both of us The transaction’s content is siuys will provide me the materials and venue needed for the reviehile I will construct a vacuum pipeline with a speed limit of 5,000 kilometers per hour for you

“My current location is Beijing U for a ers and said, “Let’s head to Shanghai The distance between Beijing and Shanghai is over a thousand kilometers Once the construction is coovernment for free Of course, its ownershi+p will remain with me What do you think of this transaction?”

As soon as Chen Yu was done speaking, the bullet comment section of the five livestream rooms immediately exploded

[crap!]

[crap!]

[crap!]

[I need to drink some dichlorvos to calm down]

[Government: ???]

[Heaven-sent fortune]

[UP, you’re the ruler of the world!]

[If it really is opened to the public, we can ride on it as well]

[Seeking to find out the psychological state of the various countries right now, lololol…]

[As a blind person, I’m very excited to see this scene]

[As soon as this route is opened…]

At the sa…