Chapter 228 (1/2)
Mojiang desert, the border of line 2. Taking advantage of his money, Jiang Chen directly built a two-way four lane Expressway at a cost of 300 million. This expressway starts from the border in the West and ends at the north outer ring road of Mojiang Free Trade Zone in the East.
After the road was repaired, Jiang Chen spent another 12.5 million to buy street lamps. After the street lamps were planted, Jiang Chen built a super waste treatment center on nearly 100000 mu of land in the north of the road.
After circling the land, Jiang Chen planted a waste treatment plant. All the waste treatment plants he planted are waste treatment plants worth tens of millions covering an area of 100 mu. Such waste treatment plants claim to be able to handle millions of tons of waste a day, but they can't handle that much at all. It's a million. It's good that a waste treatment plant can handle 20000 tons a day.
Garbage disposal is not as simple as you think. First of all, garbage should be classified. Now most cities do not have the good habit of garbage classification, so their garbage is basically mixed together, which brings them great trouble in garbage disposal.
However, fortunately, after Jiang Chen studied it, he found that his waste treatment plant also has a function, that is, it can classify the waste through the background setting. After setting it in the control room, he only needs to pour the waste into the waste pool and automatically classify the waste in the waste to treasure workshop.
After the waste is sorted, the staff also need to transport the waste to several other waste treatment plants for reprocessing.
Therefore, in order to deal with the urban waste of the whole new province and even the whole west, Jiang Chen needs to build many waste treatment plants.
”Buy 200 waste treatment plants first!”
Jiang Chen directly flushed 2 billion yuan. After flushing the money, Jiang Chen clicked a button to plant, and soon rows of neat waste treatment plants appeared in front of Jiang Chen. Jiang Chen set up the method of linking the front and back of the two waste plants. In this way, the front waste plants are classified, the back waste plants are directly turned into treasure, and then there are roads in front of and behind the waste plants, The road ahead is filled with garbage, and the road behind is filled with treated garbage.
After planting 20000 mu of waste treatment plants, Jiang Chen is ready to build them into living and office areas.
When it comes to the office area, Jiang Chen plans to rely on this super waste treatment plant to establish Saha renewable energy group, which will be responsible for all waste treatment plants in the scenic spot and take over all waste treatment tasks for China.
Therefore, Jiang Chen plans to build a group land covering an area of 1000 mu on the side close to the highway. In the future, houses will be built here as the office hall of the group.
In addition to the land used by the group, considering that the waste treatment center will require less than 10000 employees, Jiang Chen has directly built a family land near the south. The family land is empty. The land desertification here is not serious, so he can build a house. When Jiang Chen has built the waste station, he will let the construction site settle here.
After leaving more than 10000 mu of domestic land, Jiang Chen thought that after turning waste into treasure, he needed to reprocess, process and sell it. Therefore, Jiang Chen reserved more than 20000 mu of land in the north of the domestic land to set up a sorting and processing plant. There was a packaging plant in the sorting and processing plant, which was responsible for uniformly packaging all recycled waste and then selling it.
Of course, before the things are sold, they need to be stored in the warehouse, and the warehouse reserved by Jiang Chen is in the west of the group office area, where there is nearly 10000 mu of land.
After everything is designed, the whole square is like the garbage treatment center of the city. On Jiang Chen's plan, there is a waste treatment center covering an area of 100000 mu. In the north is a sorting and processing plant and packaging plant covering an area of 20000 mu. In the East is more than 200 super waste treatment plants. In the middle of the super waste treatment plant is a four lane Expressway directly leading to the bonded area.
To the east of the square processing center is the office area of SAHA renewable energy group. There is a road at the door of the office area leading to highway 2.