Chapter 85 (1/2)

”Commander Lu, I didn't say you?”

”I know! But I did give the order. At that time, I did forget that you were still at the bottom of the dam. It was my negligence.” right is right and wrong is wrong. There is no need to hold a face.

”Xu bang, you're finished. You dare to scold company commander Lu for not giving you food tonight.” Chang Yan jumped out like a little squirrel.

”The little girl talks nonsense. Be careful that no one pays attention to you.” Lu Ziming pinches Chang Yan's round face. ”Let's give a hand and get the white fish up quickly.”.

With the help of Lu Ziming, Xu bang and several female soldiers, the white fish was soon pulled to the dam crest.

As soon as the whitefish just reached the top of the dam, people felt a tremor beneath their feet, and a long thin column of water rose to the sky. Then the water droplets became thinner and thicker, forming a milky white foam. The air was filled with water mist everywhere. The sunlight was shining, and the colorful rainbow hung on the water mist, which was charming and beautiful.

”There's electricity”, I don't know who shouted.

”There is really electricity”, the street lights on the dam crest are on one after another, and the whole hydropower station is on, forming a colorful landscape painting with the dusk in the valley.

”Du Cheng, what's the situation now?” Lu Ziming rushed into the control room. He felt that the lights in the control room were bright, and the long lost electrical age came back. Looking at the flashing lights, he felt that every cell in his body was jumping with joy.

”Commander Lu, it's the independent power supply state of the hydropower station. I haven't entered the control state of the hydropower station yet?”

”You mean you can't control the hydropower station now?”

”Well, there are many parameters and conditions, such as how much electricity is needed, how much valve is opened and how long it can last. Moreover, this hydropower station is mainly used for irrigation, with an installed capacity of only 10000kw, which can supply 10000 people with normal lighting a day.”

Lu Ziming couldn't understand a word of Du Cheng's professional terminology. ”I'll ask you if the power generation here can guarantee the use of yangjiaji industry. If so, how long can it be guaranteed”.

Du Cheng quickly calculated on the paper with a pen and said, ”commander Lu, according to the current industrial power consumption scale of Yang Jiaji, the hydropower stations here can be fully met, but...”.

Lu Ziming was delighted, ”what is it?”

”Commander Lu, the hydropower station generates electricity according to the amount of water in the dam. More electricity can be generated in the wet season, but it can only stop running in the dry season. Now the water in the dam is full and can generate electricity continuously for one month. If the three generator units operate separately, Yang Jiaji can maintain the power supply for three months, and it may freeze in winter No more electricity. ”