Chapter 264 (1/2)

Age of Dreams Jun Xiucai 29170K 2022-07-23

At the headquarters construction site, because more than 5000 workers went to help, the progress was as fast as ever.

However, the necessary specified time should be observed, such as the pouring and drying time of concrete, the test of each floor, etc. if you are eager for success, it is easy to cause bad consequences.

To do these technical work, what I fear most is the word ”urgent”.

I haven't heard of anyone who can rush out a good work. Calligraphy and painting people often do it when they only draw a picture in a month or two, which is one of the differences between them and third rate painters.

Xiao Qi built the headquarters building according to the architectural requirements of foreign century old stores. He wants to see the same fairy company as when it was first built in 100 years.

Just like today's people, when they go to Paris, France, what the buildings in the ancient urban area looked like 300 years ago, what you see now, and you can enjoy the scenery hundreds of years ago.

Therefore, although he kept improving, Xiao Qi did not interfere with the construction progress at all, especially the construction of main buildings. The word ”seek fast and good” is far less popular in Xiao Qi's heart than ”slow work produces fine work”.

In the early morning, with the sun on the ground, standing on the huge mound of the construction site, watching the hot work scene, the young man's heart is also full of surging excitement - this is my own company!

Now it is mid and late May. Four floors have been built in the laboratory and headquarters building of three circular flying saucers, and the dormitory building and staff housing are almost the same progress.

However, flowers and trees are not planted in advance, because the flying dust and river sand and cement are the biggest killers of flowers and trees.

Even flowers and trees can't be planted. Naturally, those outdoor activity places just leveled the site and didn't dare to carry out perfect decoration.

The shelves of swimming pool, cinema, basketball hall and so on have been put up, and the decoration process inside is also going on nervously.

Xiao Qi went in and looked at it. He felt that it was not much different from the loose environment he envisaged. Moreover, each museum had its own characteristics in terms of appearance and internal structure. It was worthy of inviting masters to design one by one, which was just different from the goods on the road outside.

There are not many people in each venue. The great thing is seven or eight hundred, and there are three or five hundred less. It is not a face project. Naturally, there is no need to seek perfection.

Only the three storey factory area covering an area of 200 mu has been completed, and now the decoration of external walls and internal painting and finishing have been started.

Under the leadership of Zhou Bo and Xu Weihong, Xiao Qi walked into the workshop from various venues. Looking at the spacious and bright workshop, Xiao Qi really wanted to install the production and assembly line as soon as possible to achieve the same hot assembly scene as fairy mobile phones.

Zhou Bo couldn't help asking, ”little boss, when can our new product start production? The workers have asked many times. They always do these construction projects, and everyone feels bored. ”