Chapter 198 (1/2)
Two years later....
”passengers, the plane has safely arrived in the Republic of Mali, the ground temperature is 35.1 ° C, and the plane will taxi for a period of time. Please sit in your seat and pay attention to the switch of your luggage when you pick up your luggage, so as to prevent the luggage from sliding out...” a dark blue coated civil aircraft passed through the thick clouds and came to the sky of mogahaza city.
In the past two years, Titan group spent a lot of money to buy all the land in shantytowns in the city, and moved the residents of shantytowns to the suburbs of the city.
At the same time, these shantytowns were demolished and rebuilt, and the urban road system was optimized again.
At the heart of the city is a 20 story pyramid shaped concrete building, which was built by Titan and leased to the Malian government.
Taking the government building as the center, 18 main roads radiate to the outskirts of the city. At the same time, there is a ring road every two kilometers, which forms the first, second, third and fourth ring roads of the city.
One ring of the city has been covered with concrete skyscrapers, all of which belong to the subsidiaries of Titan group. The biological display covering the whole floor is constantly flashing various advertising words about Titan group.
The second ring road is the office buildings of investors brought by Titan group from all over the world. After the business environment in Mali is stable, the cheap labor resources of the Republic of Mali and a large number of basic resources produced by Titan mining have become the highlights of attracting these investors.
At the same time, Titan energy promised only half of the market price of electricity, which attracted many enterprises in urgent need of a large amount of electric energy.
Even some Internet enterprises in Xiaguo have moved some servers and other equipment to moganja city.
Thanks to the extremely cheap electricity produced by the energy blanket, Titan energy has a profit of 99.99% even if it sells industrial power at a price of 0.2 yuan per kilowatt hour!
If the enterprise is willing to invest one billion dollars in the local area, the industrial and commercial power consumption will be 10% off!
If the investment is more than 10 billion dollars, all electricity consumption will be 20% off!
You know, such a low price can't be achieved even if the Three Gorges dam is completed!
Such low electricity charges have attracted hundreds of enterprises of different sizes from all over the world, and the investment from these enterprises directly doubled the GDP of the Republic of Mali in the first year!
With the establishment of various factories and the entry of enterprises, a large number of high-income jobs have been created for the Republic of Mali.
At the same time, the ”high-income” people who come from abroad to work in the Republic of Mali are driving the development of the local economy.
The explosion of factories, office buildings, and local residents with increased incomes are all driving the consumption of electricity.
The whole Republic of Mali will consume 100 billion kwh in 2020! That is, 100 billion kilowatt hours of electricity, Titan energy will be able to obtain more than 10 billion soft dollars per year!
All of this income was invested in the development of the Republic of Mali.