Chapter 465 (1/2)
September 9th.
It's a good day, at least for Luchuan.
After a long time of planning, the construction of the storage area has finally started. This project is not launched by Baichuan Guihai company, but with Yiran's purchasing company as the main investment company.
With the approval of 5000 mu of land, it can be regarded as a very large-scale storage area.
In order to operate this storage area well, Yi Ran has made great efforts.
For example, more than 20 foreskin companies have been set up to cooperate with purchasing companies. Not only that, but also Iran's huge network of relations has played a role. After many joints have been opened, construction will start so quickly.
Lu Chuan did not participate in this project, but was present.
Standing in the distance, looking at dozens of bulldozers, dozens of excavators, and more than 300 clay trucks, we have such a large lineup in the case of a large amount of money.
Yi Ran's method is very rough, that is, smashing with money.
Give a certain proportion of money first. As long as you are willing to work and finish one more day, you will get more money. As long as you can advance a month, get more than a third of the project money, it is not difficult.
Compared with other continuous arrears of money to start work, Iran is directly to do that step, on the settlement of that step, is not bad money.
With this kind of writing, it is difficult for the engineering team to work hard.
If you have money, you can be self willed. For example, you have signed a contract with a construction company. They will enter the site on the fifth day after the commencement of the project and start to build the warehouse according to the design drawings. It's all about digging and leveling while building.
It was senior officials who came to preside over the commencement ceremony. Lu Chuan also met several times, but this time Lu Chuan came secretly and did not meet each other. He just watched him speak from a distance.
It's not enough to invite a senior official to come. This kind of attendance is not simply a matter of attending. It's just for the purpose of the platform in the storage area.
”Boss, it is estimated that the storage area can be put into use in half a month and the construction will be completed in three months.” Yiran stood beside Luchuan, holding an umbrella to block the sun for Luchuan.
With Yi Ran's size and appearance, if seen, they will certainly despise Lu Chuan one by one. He is just a slag man, and he doesn't know how to take pity on her.
Lu Chuan felt that he took it for granted. He squinted across the area. In terms of site selection, due to the avoidance of mountains, the leveling work here is not very large, and the warehouse is only built, so the foundation requirements are not high.
After three months of construction, with the power of money, it is not a problem.
Lu Chuan nodded and said: ”this matter, you just stare at it for the time being. If there is any problem in the construction, please report to me.”
Lu Chuan has seen the design drawings.
The whole storage area will be surrounded by walls, all of which are five meters high and one meter wide. The cost of enclosing walls alone is huge. In order to speed up the progress of the project, we adopted the method of sub contracting, which directly means that more than 3000 people have built this fence.
With the help of modern machinery, 3000 people built it at a predictable speed.
The construction of the storage area is absolutely sensational, because it is not poor in terms of money, and it is totally using money to make progress. To be sure, it will be a new speed of construction here.
In fact, this kind of acceleration was decided by Lu Chuan.
Qian Luchuan is not afraid of flowers, but what he wants is speed. Now he really needs a large transfer station. For example, the fighters and helicopters in the military base need to be transferred. It's really not suitable in the city of Handong.
But not here, when the time comes, several large warehouses will be planned, that is, aircraft carriers can be put down.
Lu Chuan did not attend the commencement ceremony, but it was not rare on TV news.
Under the leadership of senior officials, a large number of distinguished officials, major investors and so on, in fact, in a specific place, a stone tablet is filled with a little mud, you and I can make sense of it.
When the ceremony is completed, the machinery that has long been waiting for will roar and be put into construction.
As soon as the ceremony was over, officials of all sizes left, leaving only the construction workers here.
Instead of leaving, Lu Chuan looked for a highland. Looking at the hundreds of bulldozers and excavators below, 300 clay trucks were waiting to load mud, and they kept coming in and out. Thousands of people were as busy as ants, and their hearts were surging.
Five thousand mu of land, what a large area, is now under our own planning.
No matter how much money is, it is just a string of figures. However, the 5000 mu of land in front of us is different. It gives people the feeling of success and mastery.
After staying here for half an hour, Lu Chuan said, ”let's go.”
Lu Chuan's time is precious, and he can't stay here all the time. Now the dust is flying, and there is nothing to see. Only half a month later, with some foundation, can we see the magnificent side.
…………
Han Dong Hotel.
Lu Chuan walked into here and found for the first time that the hotel was built and operated by Han Dong real estate.So it makes sense for Chen Jiarong to invite himself here.