Chapter 666 (2/2)
”I'll ask the official, but I'm afraid I'll explain the project.”
”The main base of Mars project and future space exploration project, someone should contact me at that time, and I will explain.”
”OK, I'll go back to deal with the affairs and ask Secretary Yi by the way.” After Zhao Min finished, he turned around with a smile: ”tomorrow I will also give you benefits, send you a group of photos to see the effect of the medicine you are studying, and provide you with experimental data!”
Chen Mo is slightly stunned.
But Zhao Min had already smiled so much that he had no choice but to leave the laboratory.
”Mo Nu, now starts the research of brain wave induction technology and neural consciousness connection technology, and calls out all the existing relevant information.”
It's time to start the technology of brain wave sensing device and neural consciousness connection system.
After the completion of ”Mo Nu plan”, he can concentrate on starting the planetary transformation project.
……
”Tiannv is in orbit for Mars.”
”Ready to launch the satellite.”
More than 100 million kilometers away from the earth in the distant interstellar space, above a red planet, after eight days of lonely journey, tiannv successfully entered the scheduled orbit of Mars.
”Ready to launch the satellite.”
Under the command of tiannv's artificial intelligence, the capsule of tiannv is slowly opened, and a huge space is exposed in the universe.
One by one, the satellites were orderly released by the mechanical arms in the carrier cabin and left the carrier cabin.107 satellites, the first to deploy the Mars space satellite network, are preparing for the future Mars transformation project.
Each satellite is equipped with a small ion engine to provide long-term power for the satellite.
After leaving the capsule, the satellite, propelled by an ion engine, flew toward a predetermined orbital position on Mars. Every micro-computer has artificial intelligence, which can adjust the orbit and speed of the satellite at any time according to the instructions or the latest data.
”Satellite launch completed, hatch closed.”
”Tiannv is going to land on the surface of Mars, 10 seconds to slow down...”
All the satellites were sent to Mars for networking. Tiannv slowed down, was captured by Mars gravity, and slowly landed on the surface of Mars.
For about five hours, in the flat land of a rift valley, the tiannv slowly landed in this desolate land for hundreds of millions of years.
Several robots lifted the seismograph out of the cabin and began to install it in this desolate area. About ten minutes later, after the installation, confirm that the seismograph is started, and the tiannv will slowly fly to another scheduled installation site.
The pioneering team of Mars exploration has entered Mars.
One day later, 31 seismographs arrived at the designated area for installation.
It was determined that the initial networking was successful, and the tiannv took off from the Martian soil and flew back to the earth.
The first Mars mission, perfect.
”Moog, the Mars satellite network and the first phase seismograph network have all been installed. Tiannv has returned from her journey to get the Martian soil. It will be back at the base in about seven days. ”
Soon after the installation, Mo Nu told Chen mo the good news.
On the projection of the holographic platform, there are already pictures taken from Mars, as well as preliminary information about Mars detected.
”Let the goddess carry the second batch of seismographs to Mars, and start the installation of the second batch of Mars seismographs.” Chen Mo said.
Seismograph is the main data source of planetary reconstruction.
This project needs a lot of geological data, the more detailed the better, so Chen Mo determined the project and asked Zhao Min to prepare the seismograph.
”OK.”
”Mo Nu, you should now focus on the information you have explored to simulate the preliminary scheme model of Mars reconstruction.”
There are not many Martian data collected at present, but with the continuous improvement of seismograph and satellite network and the collection of more Martian data, the future project model will be more and more perfect.
Multiple planetary modification models can be built, which makes it more flexible to choose a project.