Chapter 209: Xiaoping Lake 2 (1/2)

Giving up Xiaoping Lake means giving up all hope.

Xiaoping Lake has been reported as a residence plan. If the location is temporarily changed, the person in charge of the team will inevitably ask for the reasons.

Originally, Zhongyun did not have much confidence in whether it can pass the review of urban health and civilization construction.

If this is the case, even if it thought with its toes, it knows that it would be squinting at the inspection team.

”Can't give up!” Vice Mayor Wu Shunyun stood up and took off his mask and showed his firm expression again.

”I can't keep my eyes open and watch all the organs and business people in Zhongyun City and worked hard for three months. In the end, I had no hope, and I would even be severely criticized.”

”We have sewage in front of us. It is 1/4 of polluted Xiaoping Lake, not the sky in front of us.”

”From now on, we want people to give people equipment. Whether it is membrane filtration, biodegradation, chemical degradation. We fight, even if it is not well managed, at least we have worked hard.”

Even spelling, we should find the most reasonable spelling.

Two old professors from the chemical industry helplessly began to work on a plan that was doomed to failure.

At first, is deodorization, the smell of the water surface of Xiaoping Lake is really unbearable.

Two old professors plan to carry out large-scale deodorization by setting up ultraviolet radiation lamps.

There is a lot of ammonia and hydrogen sulfide in the water, which are easy to produce odor.

The two professors have developed inhibitors that are sprinkled into a large number of natural plants to decompose and absorb.

There are also membrane filtration technologies.

The ceramic membrane can indeed filter the sewage. Even if it can't solve all the sewage, it can at least filter out the harmful chemical components in the water.

At noon that day, people from sewage treatment stations, ceramic film manufacturers and stage lighting design studios gathered here with a large number of types of equipment.

Around Xiaoping Lake, there were rows of the large-scale array of lights like in an array of open-air concerts.

The incandescent lamp was replaced with an ultraviolet lamp. Several sewage treatment station workers wearing anti-UV suits were rowing boats and spraying the inhibitors into the water with a nebulizer.

The ceramic membrane filter device was also sent over, this small filter device with a multi-stage filter tube, as soon as it was put into operation, it played a very good effect.

Original blue-brown sewage, When it is pumped into the filtration station by the water pump, it becomes a clear brown like tea when it comes out along the water outlet.

The color changed, and the pungent smell before it was gone.

However, the good weather did not last long, the ceramic membrane filtration station just worked less than two minutes, the water flow at the outlet slowly suffocated, and the pump also followed the whistling noise.

When the workers opened the filter station casing, the entire row of ceramic membrane filters was completely blue.

The ceramic membrane filter is made of milky white, and it has a number of pores with a diameter of several tens of nanometers.

It can physically block many impurities that can be found in the water, in the filter tube.

The higher the impurities in the water, the faster the obstruction will naturally.

The workers took out the filter tube, and the filter tube not only turned into color but also filled with a thick layer of chemical waste, which made people feel sick.

There is a high-pressure flushing car next to it, and the filter tube is washed back under high pressure.

After the pollutants are washed away, the ceramic membrane filter tube can continue to be used.

However, dozens of mobile filtering stations in the field, after less than two minutes of operation, had to be dismantled and cleaned with a high-pressure water gun.

After cleaning, the working time became shorter.

”Renew the filter tube!” Deputy Mayor Wu Shunyun ordered.

On the side of Longxitan Beach, Ye Qing is still in the assembly shop.

The pollution of Xiaoping Lake, Ye Qing did not know for the time being.

The technology equipment of the water resort was completely loaded when it was last time, and many of the friends' circle uploaded.