211 6.5 Three Hours, Five People And 60k Refined Steel Plates Done (1/2)
We sat down on the ground of the Ops Room and began our meditative state and when we opened up our eyes, we had gathered on the Shrine where the Shilton no Tama was placed.
Since it was the last place we had been, I swiped the scene to the left and ended up at the Blacksmith area. I swiped again and came to the Essense extraction room and I disintegrated the heavy print set machine out from there.
Find authorized novels in Webnovel,faster updates, better experience,Please click visiting.
I then swiped the scene to the right and came to the Blacksmith area and I visualise the heavy print set to appear on an empty spot. There were sacks of iron ores, coal and limestone in standby. Since there was a single dispenser machine, I visualised another 4 similar ones with the conveyor belt and the forced cooling cryogenic system in the middle of the 3-meter track.
After all the 4 dispensers were visualised, the settings were fixed to release the Molten steel onto the target area for the fixed number of seconds to properly fill the moulds on the trays. It took about 15 minutes to get everything running and the temperature was quite alright because the furnace was not running yet.
I visualised a bigger smelting pot that could supply at least 5 dispensers at three-quarters full each time and since we have 5 dispensers, the proportion for the iron ores became 16 buckets, 8 buckets each for the coal and limestone. I started the automated pump of the furnace and the intense rising heat at first made Sango and Kikyo moved to the end of the conveyor belt away from the furnace.
It was painstakingly slow to remove all the slag and impurities but after the temperature hit the boiling point of steel, it was much easier to remove the slag. They looked a where I had dropped the slag and asked me where it ended and I said it may have given to a factory called Iron Mountain somewhere in Jurong.
I pouted the contents of molten steel into my main dispenser and showed them an example. I took a tray behind me, locked it in place in the target area and stepped on the pedal once to release the Molten lava onto the tray. It sizzled because of the heat and the molten lava ran into the 'runway' and ended in the plate reservoir.
I unlock the moulding tray and it moved into the forced cooling cryogenic chamber and slowed down. I made everyone test on my machine first and once they have gotten used to the procedure, they went to their individual dispensers system.
After ensuring the release system for the dispensers is accurate, everyone was armed with a kitchen muff to carry the plates over on the pallet. I advised them to be careful as I slowly manoeuvred the boom to pour the contents from the smelting pot into the dispenser systems.
After all, had been filled and emptied, I replace the smelting pot with another batch of iron ores, coal and limestone. And soon the process begin...! Everyone took their tasks seriously and only I can't keep up the pace since I have to smelt and clear the slags and after I had set the molten lava to be on heating point, I started my process on the dispenser system.
Inuyasha was mimicking the sounds the machines were made with his mouth and I'm sure that tonight in his dreams he would be mouthing the same sound effects too. Hahahaha.
Soon 125 moulding trays were loaded on each pallet and were pushed away to make space for more pallet trolleys.
1 pallet...
5 pallets...
15 pallets...
30 pallets...
48 pallets.....
”Phew...!!! That's it, guys. We have reached our target for the day. Its been 3 hours here and we had reached 6,000 moulding trays already. Leave the rest in the dispenser units, once we leave this Realm of Mind, this place would be frozen in time.”