Chapter 249: The mysterious administrator (1/2)

In the limonite area, there are three Mechanical Colossus Type X-shaped plates here

The Mechanical Colossus Type X is a th most in the behemoth heavy work

It is still unable tohas onlyand only two constructors

The other side of ht ht of the sa equipment, it can easily break and crush any rock

In thearea, a deep hole see by four angry miners, in order to meet the requirerybrute force

The iron ore was cut out into a crack, with a standard of 500 tons, which facilitated the crushi+ng work of the Mechanical Colossus Type X

A Mechanical Colossus Type X-shaped, a new cutting wheel h iron ore strips into a stone of about 100 tons

Then the other two Mechanical Colossus Type X-shaped, respectively grab hundreds of tons of ore shi+ning same as the diamonds, to broke it

The pieces of waterh the conveyor belt and the dus

These pieces of ore are crushed between two pieces of hard-rolled grinding discs and ground into unifor and grinding into powder

Finally, the netism to separate the metal in the powder from the rock

In order to achieve the production of 10,000 tons of pig iron per day, itsstood in front of this e concrete processing station The lower separation port, the gray-black iron powder, and the gray-white stone powder are continuously separated as the flood gates

Iron powder is sray-white stone powders are not wasted After being incorporated into binders and other minerals, they are natural floor , the first batch of 1,200 tons of iron poas mixed with the catalyst prepared by the Master Metal Expert

It was die-cast into iron powder and sent to a preheated sintering furnace for pig iron sintering

Traditional steel mills smelt iron powder, which is usually sent to the blast furnace and is sprayed with pulverized coal or heated with heavy oil and natural gas

The use of electric heating like Ye Qing does be rare, because electric heating costs are high

Now that the price of energy products is lower, many steel h-contah, there is al speed is abnor process lasted for an hour When a piece of raw iron ingot was placed in front of Ye Qing, Ye Qing alots, and the iron ingots in his uessed

Ordinary raw iron ingots, the surface is full of pits, the appearance can also see a lot of impurities embedded in it, he is likely to break when it is hit hard

These pits are the gas eyes produced by the co

The Master Metal Expert s iron

It is a silver-white material with a smooth surface like a ated hair

These iron ingots can be directly put into the , and the steel products to be smelted ardless of toughness or strength

Steel is the most widely used metal in the factory

Its quality has improved, which means that the entire plant will improve its performance whether it is built by itself or sold

These steels are completely smelted in the factory, and the price is far lower than that from the market

Every s step ahead in the industry

Ye Qing is full of energy and has been busy producing until late at night before returning to the office to rest